Major Overhaul On Chlorine Booster Pump

Detail : Major Overhaul On Chlorine Booster Pump
Project Date : 18 Dec 2022

The major overhaul involved comprehensive servicing and replacement of the chlorine booster pump system. Key tasks included servicing a Electric vertical multistage centrifugal pump and variable speed drive. Additional improvements comprised replacing electrical cabling, installing a new industrial-grade roof, and adding an automated lighting system. A new control panel was integrated with advanced features, alongside the installation of new pumps and PVC piping on MS skids. The project concluded with site testing and commissioning to ensure reliable operation.